| Ticket | INC | Site | P | Travel | In Prog | Resolve | OT | Dur | URL | Desc | Act |
|---|---|---|---|---|---|---|---|---|---|---|---|
| TD-338116 | INC000000616495 | CGK01 | P2 | 17-Jun 10:53 | 17-Jun 11:01 | 17-Jun 11:59 | No | 1h 6m | completed doing power test and loop test, confirmed by Mhar Anthony Cabrera | ||
| TD-338132 | INC000000616827 | CGK14 | P1 | 16-Jun 14:19 | 16-Jun 14:27 | 17-Jun 00:53 | Yes | 10h 34m | waiting for the PCR, completed the device swap, then standby while waiting for the device to turn up, doing some power cycle, checking UTP connection, preparing usb for re-image the device, then confirmed by Shawn Miller that device is turned up |
INC000000616495
CGK01
P2
No
10:53
11:59
11:01
1h 6m
completed doing power test and loop test, confirmed by Mhar Anthony Cabrera
INC000000616827
CGK14
P1
Yes
14:19
00:53
14:27
10h 34m
waiting for the PCR, completed the device swap, then standby while waiting for the device to turn up, doing some power cycle, checking UTP connection, preparing usb for re-image the device, then confirmed by Shawn Miller that device is turned up
No tickets match your filters